In September 2021, Shenzhen Expressway acquired 100% equity of Yongcheng Zhuneng New Energy Technology Co., Ltd. through its new energy company. The project is located in Yongcheng City, Shangqiu City, Henan Province, with an installed capacity of 32.2MW, using 12 Nanjing Wind Power NJ140-2.5 wind turbines and 1 Nanjing Wind Power NJ130-2.2 wind turbine. This project is the first decentralized wind power project in the new energy energy sector, which brings demonstration significance for the development and operation of decentralized wind power in the future.